Industrial
INDITEX, S.A.
- Execution project and construction management of engineering works for the provision of corporate building facilities in Arteixo. (250,000 m2) (2024)
- Project to implement a robotic storage area and palletizing cell in the Narón Logistics Center expedition area (2023).
- Execution project and construction management of engineering works for the provision of facilities to the new corporate building in Arteixo (70,000 m2). (2021). Project developed in BIM. Building with LEED PLATINUM certification.
- Office renovation project in the Logistics Center (2019). Project developed in BIM.
- Project of a gym for the Logistics Center in Arteixo (2019). Project developed in BIM.
- Execution project and construction management of engineering works for the provision of facilities to the new services building for the headquarters (SYSTEMS) in Arteixo. (2018). Project developed in BIM. Building with LEED GOLD certification.
- Execution project and construction management of engineering works for the provision of facilities to the new services building for the headquarters (DINING ROOM) in Arteixo. (2018). Project developed in BIM. Building with LEED GOLD certification.
- Project of a gym for the Logistics Center in Arteixo (2018). Project developed in BIM.
- Study of fire loads and preparation of the self-protection Plan of the Arteixo Logistics Center (2017).
- Renovation and expansion project for evacuation and public address systems in the Arteixo Logistics Center and in the Denllo and Stear factories. Arteixo – A Coruña (500,000 m2) (2016).
- Execution project and construction management of the new staircase cores executed on existing slabs in the Logistics Center in Arteixo (2014).
ALUMINIOS CORTIZO, S.A.
- Project and Construction Management of the Technological Campus in Padrón. Project developed in BIM (2021 – 2022)
- Execution project for wastewater treatment plant expansion in Granadilla de Abona, Tenerife (2018).
- Preliminary project for installation of a wind turbine in Granadilla de Abona, Tenerife (2018)
- Horizontal lacquering line project in industrial warehouse of the Granadilla de Abona Industrial Estate, Tenerife (2018)
- Project for a new vertical lacquering line in an industrial warehouse in the Granadilla Industrial Estate in Abona, Tenerife (2018)
- Industrial warehouse project for storage and distribution of aluminum profiles in Granadilla de Abona, Tenerife (2017)
- Project of two warehouses for use as a workshop and warehouse for aluminum products in Manzanares, Ciudad Real (2017)
- Project and D.O. of industrial warehouse intended for storage and distribution of aluminum profiles in Burgos (2014)
- Work management of an industrial warehouse intended for storage and distribution of aluminum profiles in Torrelavega (2014)
- Basic project, execution and technical direction of renovation in the main production plant of Aluminios Cortizo in Padrón (2013-2014)
FINITEC S.L.
- Exhaust Gas Line Flexibility Analysis for an Incinerator (2017)
PESA MEDIOAMBIENTE, S.A.
- Structural calculation of the PLISAN AS NEVES WWTP (2017)
- Project and D.O. calculation of the sludge heat exchangers of two anaerobic digesters (2016)
- Design and Calculation of Steam Line at the Ourense WWTP (2016)
- Design and calculation of the heat exchangers for the anaerobic digestion process of the Ourense wastewater treatment plant (2016)
- Calculation and Design of the Dome Cap, Heating of the Ferrule and Dome and of the Access Stairs to the Anaerobic Digesters for the treatment of sludge with an internal diameter of 17 m and a capacity of 3071 m3 from the Ourense WWTP (2016)
- Calculation of Manholes for Anaerobic Digesters for the treatment of sludge with an internal diameter of 17 m and a capacity of 3071 m3 from the Ourense WWTP (2016)
INDIPUNT, S.A.
- Execution project and construction management for renovation of an industrial warehouse (2018). Project developed in BIM.
- Development of action protocol in case of emergency and simulation of systems action (2018)
- Industrial washing facility reform project (2017)
- Project to adapt industrial warehouse to the activity of warehouse of machinery and textile articles (2014)
- Project to dismantle existing cogeneration plant (2014)
- Firefighting project that includes a study of evacuation, signage and public address systems for the facilities in Narón (2014)
FORESA, INDUSTRIAS QUÍMICAS DEL NOROESTE, S.A. (FINSA GROUP)
- Execution project Phase II of Formol Plant renovation (2023)
- Steam turbine installation project for generation in supply mode with self-consumption without surpluses (2019)
- Formol plant execution project (2018). Project developed in BIM.
- Pipe stress calculation – Caesar. Chemical Sector.
- Basic project to improve energy efficiency in the glue and formaldehyde manufacturing process
- Processing of the subsidy for the corresponding project.
- Project to legalize the installation of high and low pressure steam pipes.
AIR LIQUIDE IBERICA DE GASES, S.L.
- Execution and management project for the air conditioning and air renewal system in the services building in A Coruña (2018)
INDUSTRIAS LOSÁN, S.A
- Execution project for industrial warehouse for paper printing (2021)
- Execution project for Pallet Block warehouse, Cleaning and Screening Tower (2022)
- Project and Construction Management of an industrial warehouse (2500 m2). Project developed in BIM.
Energy
HYDROELECTRIC ENERGY
RÍO DAS MESTAS HYDROELECTRIC PLANT
- Hydroelectric exploitation project on the Mestas River, with a power of 1367 KVA – Cedeira substation – Year 2001
MERA RIVER HYDROELECTRIC PLANT
- Hydroelectric exploitation project on the Mera river with a power of 1680 KVA – Mourela substation – Year 2001
RÍO GRANDE DE XUBIA HYDROELECTRIC PLANT
- Hydroelectric exploitation project on the Grande Xubia River with a power of 543KVA – Cedeira substation – Year 2001
TÍO PEQUEÑO DE XUBIA HYDROELECTRIC PLANT
- Hydroelectric exploitation project on the Small River of Xubia with a power of 502 KVA – Cedeira substation – Year 2001
AVELLAS RIVER
- Project to expand hydroelectric exploitation on the Avellas river using a 691 kWe turbine
WIND ENERGY
NESA VENTO GALEGO 3, S.L.
- Arca Sur Wind Farm Project
- Monte Arca Sur wind farm sectoral project
NESA VENTO GALEGO 2, S.L.
- Monte Arca Norte Wind Farm Project.
- Monte Arca Norte wind farm sector project
VENTO CONTINUO GALEGO, S.L.
- Expansion of Monte Arca Wind Farm Project Phase II
WIND ENERGY PROJECTS IN COLLABORATION WITH OTHER ENGINEERING
- P.E. Project Fonsagrada (45 MW) and 30/132 kV Substation, Lugo (ECyR)
- P.E. Expansion Project Fonsagrada (4 MW), Lugo (ECyR)
- P.E. Project Punago (25 MW), Lugo (ECyR)
- PP.EE Projects. Serra das Penas and Penas Altas (96 MW), Lugo (ECyR)
- P.E. Project Alto Cabrera (48 MW), León (ECyR)
- P.E. Project Serra Seca (48 MW), Ourense (ECyR)
- P.E. Project Pena da Cruz (36 MW), Ourense (ECyR)
- PP.EE Projects. Munera I and Munera II (70.5 MW), Albacete (Neo Energía)
- Preliminary draft P.E. El Páramo (28 MW), Burgos (Neo Energía)
- PP.EE Preliminary Projects. Aldehuela, Cerro del Viso, Colmenar, Horcajo, La Cañada and Las Hijosas (210 MW), Madrid (Neo Energía)
- PP.EE Projects. Ágreda (18 MW) and Sierra del Cortado II (13.5 MW) and Ágreda 20/45 kV Substation, Soria (Neo Energía)
- Preliminary project and P.E. Project. Garcimuñoz Castle (49.5 MW) and 20/132 kV Substation, Cuenca (Neo Energía)
- P.E. Project La Dehesica (28.5 MW) and 20/132 kV Substation, Albacete (Neo Energía)
- Preliminary draft P.E. El Boquerón (22 MW), Albacete (Neo Energy)
- PP.EE Projects. El Rincón (8 MW), Colladillo (30.6 MW) and Cabeza Mesá (29.6 MW)
- and 30/132 kV Las Cárcabas Substation, Ávila (Neo Energía)
- P.E. Project and Quintanilla Substation (20 MW), Burgos (Neo Energía)
- Navalperal Substation Expansion Project, Ávila (Neo Energía)
- Preliminary PPEE projects La Pasadera and Loma del Rey, Burgos (Neo Energía)
- P.E. Project Salgueiras (32 MW) and 20/66 kV Substation, A Coruña (EDPR)
- P.E. Project Abadín (36 MW) and 20/132 kV Substation, Lugo (EDPR)
- P.E. Decommissioning Project Corme, A Coruña (EDPR)
- P.E. Repowering Project Corme (50 MW) and 20/66 kV Substation, A Coruña (EDPR)
- P.E. Decommissioning Project Zas, A Coruña (EDPR)
- P.E. Repowering Project Zas (50 MW) and 20/66 kV Substation, A Coruña (EDPR) PP.EE Preliminary Projects. CLM (478 MW), Cuenca (EDPR)
- Additional wind turbine preliminary project P.E. Valsagueiro, A Coruña (EDPR)
- Preliminary Project Expansion P.E. Muxía II, A Coruña (EDPR) PP.EE Preliminary Projects. La Pasadera and Loma del Rey, Burgos (EDPR)
- PP.EE Projects. La Emberniza, Eo and Urubio, Asturias (EDPR)
SERRA DE ORREA WIND PARK (July 2010)
- Preliminary project, study of wind potential, electrical interconnection and economic viability
PICO SECO WIND FARM (July 2010)
- Preliminary project, study of wind potential, electrical interconnection and economic viability
IRIXO WIND PARK (July 2010)
- Preliminary project, study of wind potential, electrical interconnection and economic viability
BIOMASS PLANTS AND RANKINE ORGANIC CYCLES
ATLANTIC FOREST
- 24MW Power Plant Project for capturing CO2 in combination with green H2 to obtain green methane, is part of the TRISKELION PROJECT (2023)
AQUONA WATER MANAGEMENT OF CASTILLA. S.A.U.
- Modification project in biogas installation in Edar Palencia (2023)
CORUÑA VALES. S.L. (Aranga – A Coruña)
- Preliminary project, project and procedures Cogeneration installation using organic Rankine cycle. Biomass boiler. 1 MW Sector: Door manufacturing (2013)
ENERGÍA DE GALICIA, S.A.
- Plant project to generate electrical energy from primary forest biomass, power 10 MW. (2011)
Sector: Wood.
HABITAT AND ENVIRONMENT RESTORATION CAAMAÑO, S.L. (Villagarcía)
- Preliminary project and licenses for the 700 kW Rankine Cycle generation plant. (2012)
MONTE ALTO (Palencia)
- Preliminary project, project and procedures for a 10 MW biomass plant in Palencia. (2011)
Sector: Energy.
COGENERATION INSTALLATIONS
FORESA, INDUSTRIAS QUÍMICAS DEL NOROESTE, S.A. (FINSA GROUP)
- Draft power plant in type II self-consumption regime. (2017) Project developed in BIM.
- Execution project, construction management for a generation plant with a 2.35 MW steam turbine (2018). Project developed in BIM.
VIAQUA WATER MANAGEMENT OF GALICIA
- Execution project and construction management for a 350 kW self-consumption plant (2018)
POLIPROPILENO DE GALICIA, S.A.U. (Narón)
- Project and processing for installation of a 1,000 kWe cogeneration plant (2014)
CONSERVAS CERQUEIRA, S.A. (Vigo)
- Preliminary project, project and procedures for a 1MW cogeneration plant. (2014)
MONDELEZ ESPAÑA PRODUCTION, S.L.U. – (KRAFT) – (Orbigo Hospital – León)
- Preliminary project, execution project and procedures for a 2MW Cogeneration Plant. Sector: Food (2012)
- Project and DO of refrigeration installation of production warehouse. (2014)
FRINOVA (Porriño, Pontevedra)
- Preliminary project, execution project and procedures for the modification of the change to gas for the 000 kWe cogeneration plant (2013)
Sector: Canning – food.
HERMANOS OBLANCA SL (Onzonilla, León)
- Preliminary project, execution project and procedures for a 500 kWe cogeneration plant. (2012)
Sector. Slaughterhouse – feeding.
SOLVIDA SANXENXO, S.L.
- Preliminary project, execution project and procedures for 1MW cogeneration plant (2012)
- Project and D.O. modification of the Augusta Hotel Transformation Center, new sectioning center to service the cogeneration installation and the Hotel. (2012)
Hotel sector.
JEVASO, S.L.
- Preliminary project, execution project and procedures for a 500 kW cogeneration plant. (2011)
Setor: Textile – Ironing clothes.
WOODS ORNANDA SLU (Porto do Son, A Coruña)
- Preliminary project, execution project and procedures for a 500 kW cogeneration plant. (2011)
- Installation of C.T. 630 kVA in factory (2011)
Sector: Wood industry.
EMBUTIDOS RODRÍGUEZ, SL (Soto de la Vega, León)
- Preliminary project, execution project and procedures for a 1000 kW cogeneration plant (2011)
- Legalization of interior installation G.N. for cogeneration (2012)
- Preliminary draft of underground medium voltage line (2011)
- Boiler room ship legalization project (2010)
Sector: Food Industry.
CAMPOBRICK, S.L. (Mesía – A Coruña)
- Preliminary project and execution project and procedures for Modification and transformation to gas of a 5×1365 kW cogeneration plant
Sector: Ceramic.
MEGASA SIDERÚRGICA, SL
- Development and implementation of a 2500 kVA autonomous emergency group
Sector: Steel products.
TOP WASH, S.L. (Arteixo – A Coruña)
- Preliminary project and execution project and procedures for the modification of the cogeneration plant (500 kW). Year 2009
Textile sector.
MASSIMO DUTTI (INDITEX Group)
- Study, Development and Implementation of a trigeneration plant (Electricity, cold and heat) in Tordera (Barcelona). Installed Power 2950 kVA. Year 2006)
ALUMINIOS CORTIZO SA (Padrón, A Coruña)
- Preliminary project and feasibility study for the modification of the switch to gas for a 10 MWe cogeneration plant
Sector: Aluminum.
Building and installations
AMANCIO ORTEGA FOUNDATION
- Project and Technical Assistance to the Construction Management of building facilities for residence and nursery school in Arteixo (2016)
ELSA URQUIJO ARQUITECTOS, S.L.
- Project of building facilities for the Amancio Ortega Foundation daycare center in Sardiñeira – A Coruña (2014)
FERROVIAL SERVICIOS, S.A. (FERROSER)
- Project and D.O. of 10 residences of the Social Services of the Junta de Castilla y León for its energy adaptation (2014).
Environmental
STAC SL (Accessory Technical Systems – Register)
- Activity project for the implementation of an aluminum composite panel process.
- Industrial water treatment installation project.
RESIDUAL WATER TREATMENT STATION (Morocco)
- Draft wastewater treatment plant for wastewater treatment in residential complex.
INCINERATING PLANT OF RISK SPECIFIC MATERIALS (MER)
- Project to install an incineration plant to eliminate the human and animal food chain from specific risk materials.
NOSTIAN
- Civil works project for dehydration plant in the urban solid waste treatment plant.
TOP WASH, SL
- Wastewater treatment plant.
PORT-VIGO, S.L.
- Preliminary oily liquid waste treatment plant.
SEVERINO GÓMEZ SUCCESSORS
- Draft draft of sludge.
Aeronautics
INDITEX, S.A.
- Execution project and D.O. of hangar for private plane at the airport of Santiago de Compostela (2017). Project developed in BIM.
- Execution project and D.O. of hangar for two private planes at the airport of Santiago de Compostela (2014)
- Electrical Project and D.O. for the installation of two Transformation Centers at the Santiago de Compostela Airport (2014)
AENA
- Technical assistance in drafting projects and control and monitoring of several works at the Santiago de Compostela Airport (2017)
- Project for dismantling the old Maritime Rescue hangar. (2017)
- Project execution and construction management of the Maritime Rescue hangar (2018)
ALUMINIOS CORTIZO SA (Santiago Airport – AENA)
- Design of private Hangar for CESSNA CITATION CJ1 model airplane, at Santiago de Compostela airport (2012) Sector: Aluminum
YAGODA INVERSIONES S.L. (Santiago Airport – AENA)
- Basic hangar project at Hangar de Palma airport
Retail
Installation projects of air conditioning for Dentix clinics in Colombia:
- Clinic located in Plaza Américas in the city of Bogotá.
- Clinic located in Primavera Urbana in the city of Villavicencio.
- Clinic located in Nutibara in the city of Medellín.
- Clinic located in Santa Fe in the city of Bogotá.
- Clinic located at C.C. Great Station in the city of Bogotá.
- Clinic located at C.C. Chia in the city of Bogotá.
- Clinic located in the city of Valledupar.
Air conditioning installation projects for Dentix clinics in Mexico:
- Clinic located at C.C. averanda in the city of Cuernavaca.
- Clinic located in Puebla Park in the city of Puebla
- Clinic located in Mepetec
Air conditioning installation project for the Gaes clinic located in Mariano Escobedo in the city of Mexico D.F.
Installation project of air conditioning for Decathlon in the city of Aguascalientes in Mexico.
VALUES SUSTAINABILITY AND INNOVATION, S.A.
Air conditioning installation projects for Dentix clinics in Mexico:
- Clinic located in C.C. Summits in the city of Monterrey.
- Clinic located in the Guadalajara Gallery in the city of Guadalajara.
- Clinic located at C.C. Plaza Mayor in the city of León.
- Clinic located in C.C. Altacaia in the city of León.
- Clinic located at the Tlaquepaque Forum in the city of Guadalajara.
- Clinic located in Interlomas in the city of Huixquilucán.
- Clinic located at C.C. El Dorado in the city of San Luis de Potosí.
- Clinic located at C.C. Altabrisa located in the city of Villahermosa.
- Clinic located at C.C. Plaza Fiesta in the city of Monterrey.
- Clinic located in Portal San Angel in Mexico City D.F.
- Clinic located at C.C. Victoria Latitude in the city of Querétaro.
- Clinic located in Chapultepec in the city of Guadalajara.
INDITEX, S.A.
- Project and Project Management of the ventilation project for the tempering of the logistics center in Cajamar – Sao Paulo – Brazil (Air volume 200,000,000 m 3 / h) (2013-2014)
- Low voltage electrical installation and control projects in the group’s stores in Mexico and Brazil:
- Oysho store in C.C. Serdán – Puebla – Mexico
- Oysho store in C.C. Paseo del Carmen – Playa del Carmen – Mexico
- Lefties store in C.C. Tezontle Park – Mexico D.F.
- Lefties store in C.C. Delta Park – Mexico D.F.
- Lefties store in C.C. Toluca Park – Mexico D.F.
- Masimo Dutti store in C.C. Gran Plaza – Guadalajara – Mexico
- Lefties store in C.C. Altacia – Mexico D.F.
- Masimo Dutti store in C.C. Plaza Mayor – Mexico
- Lefties store in C. C. El Toreo Park – Naucalpa – Mexico
- Zara store in Golden Square Shopping – Sao Bernardo do Campo – Brazil
- Zara store in Iberapuera Shopping – Sao Paulo – Brazil
- Zara store in Metropolitan Shopping – Rio de Janeiro – Brazil
R&D
CDTI PROJECTS
- Technological partner in the “GREEN PORT ENERGY CENTER” project, for the development of an autonomous trigeneration power plant for the supply of ships. (2013-2014)
- Technological partner in the project “Development of new technologies for the manufacture and operation of high efficiency biomass boilers.”, for the development of new materials for the design of a superheater in the boiler of ENCE. (2013-2014)
ANODIZADOS CORTIZO, S.A. (Register)
Preliminary R & D design of anodizer
- New anodizing process
- R & D Center
- Smart warehouse
- Logistics warehouse
ANDROGEN (A Coruña)
- Development of a device to keep the internal temperature constant in gamete and embryo transfer catheters. (R + D + i)